Generator, transformer, switchgear and BESS foundations, oil bunds and cable pits — built to the tolerances electrical and mechanical contractors need.
Plant foundations carry heavy, expensive equipment with tight cast-in tolerances. Holding-down bolts and conduit entries have to land exactly where the equipment supplier expects them.
We coordinate set-out with the electrical and mechanical contractors and record it before the pour.
Priced as a full package or separable portions to suit your procurement.
Plinths and pads for standby generators.
Transformer pads with oil containment bunds.
Pads, cable pits and conduit entries.
Foundations for battery energy storage containers.
Bunded slabs and containment structures.
Precast and in-situ cable pits and trenches.
Documents, specification and program reviewed. Buildability questions raised early, not after award.
Staging, plant, pump and crane plans, temporary works and interfaces with other trades.
Earthworks through to finished concrete, coordinated daily with the head contractor's site team.
Inspection and test plans, pour and compaction records, test results and as-builts.
Yes — set-out, conduits and cast-ins are coordinated with the electrical contractor before every pour.
Bunds are built to the design and specified containment volumes.
Yes, including regional energy projects.
Send us the package and the due date. We'll review the documents and confirm whether we're pricing within one business day.
Commercial, industrial, civil & mission-critical packages